City: Jerusalem
Year: 2025
Executive contractor: Goldman Avi Construction and Investments 1989 Ltd.
Entrepreneur: Eretz Ir
Total housing units: 19
As part of TAMA 38, all electrical, plumbing and gas infrastructure will be replaced with systems of current standards, a fire extinguishing and safety system.
Each apartment will receive an additional 25 square meters, including a living room + sun terrace and storage room.
The building will be renovated from the outside and inside, and a new and spacious lobby will be built, including an intercom and an elevator for the benefit of the residents.